I drilled the hole for the rear wheel in the 40x20 tubing using a cheap stepped cone drill. This worked very well, much better than a standard drill which leaves a ragged hole in 1.5mm steel. I have an M12 clearance, 17mm spacer inside the tube to prevent it being crushed when the wheel nut and bolt is tightened.
With the wheel fitted, I measured for the brake mount. I made an IS caliper mount using information from this excellent site:
http://www.peterverdone.com/disc-brake-mounting-systems/
Cutting out the recess where the caliper protrudes was the most challenging part of the build so far. I couldn't get an angle grinder into the recess and a Dremel was too flimsy. It took me a long time with a hacksaw and a file - the end result is functional but ugly.
A record of my efforts to construct a python recumbent bicycle, also known as a moving bottom bracket (MBB) or pivot steer bicycle.
Tuesday, 25 December 2018
Saturday, 15 December 2018
Drivetrain test
I have an old 9-speed drivetrain from another bike - today I installed it to check the chainline and clearances.
I found that I had to shorten the drive side dropout tab in order to mount the wheel with the mech installed. I also had to add a washer to the mech as the hanger was too thin (5mm) and the chain was hitting the screw. After this it was all fine.
I found that I had to shorten the drive side dropout tab in order to mount the wheel with the mech installed. I also had to add a washer to the mech as the hanger was too thin (5mm) and the chain was hitting the screw. After this it was all fine.
Sunday, 2 December 2018
Front frame assembly and welding
I've spent the last couple of weekends welding the front frame. I have no jig, so I've had to align the various pieces using careful measurement, magnets and temporary spacers TIG tacked on.
As usual, the distortions from welding have required a certain amount of bending and adjustment after welding, but I'm very happy with the final alignment and rigidity.
The front boom / BB mount and the 40x20 cross pieces are still too long and need to be trimmed. I will also add brake mounts at some point - I'm still not sure if I will use a disc or v-brake as I had the wheels built to be able to use either.
As usual, the distortions from welding have required a certain amount of bending and adjustment after welding, but I'm very happy with the final alignment and rigidity.
The front boom / BB mount and the 40x20 cross pieces are still too long and need to be trimmed. I will also add brake mounts at some point - I'm still not sure if I will use a disc or v-brake as I had the wheels built to be able to use either.
Monday, 26 November 2018
So that's why there's a guard on an angle grinder....
Flap disc abrasive on an angle grinder that I had been too lazy to replace the guard on. Silly chicken.
Friday, 23 November 2018
New wheels from Germany
The wheels arrived. I had them built by Ginkgo in Germany, as the single sided hub and suitable 406 rims are impossible to source in the UK. I've added 50mm Schwalbe Big Apple tyres - these are heavy, but will be the python's only suspension.
https://www.ginkgo-veloteile.de/ginkgoshop/en/home/
https://www.ginkgo-veloteile.de/ginkgoshop/en/home/
Wednesday, 21 November 2018
Tuesday, 20 November 2018